Connect with us

Hi, what are you looking for?

HEADLINES

ASE reduces cable power consumption by 60% with Ciena

Ciena’s GeoMesh Extreme, leveraging Waveserver 5 powered by WaveLogic 5 Extreme and an optical bypass, will deliver more capacity through ASE’s existing cable, enabling improvement in its design capacity of 193%.

Asia Submarine-cable Express (ASE), a consortium of Asian telecommunications carriers managing the ASE cable system, is working with Ciena to improve the design capacity and sustainability of its cable system.

Running a total of 8,148km, the ASE high-capacity cable system connects Japan to Hong Kong, Malaysia, the Philippines, and Singapore. Ciena’s GeoMesh Extreme, leveraging Waveserver 5 powered by WaveLogic 5 Extreme and an optical bypass, will deliver more capacity through ASE’s existing cable, enabling improvement in its design capacity of 193%. Optimized for 100GbE and 400GbE applications with unmatched scaling capabilities, Waveserver 5 also minimizes ASE’s rack space and reduces power consumption by 60% for a greener solution. 

“With Asia a key hub for international business, intra-Asia cable routes are becoming increasingly congested. In this crowded playing field, we’ve teamed up with Ciena on upgrades designed to enhance the delivery capacity of our current cables. We are especially pleased to have greener, more sustainable ways of powering connectivity and reduce power consumption,” said Mr. Yoshio Sato, ASE MC Chairman.   

The ASE cable also utilizes Ciena’s 6500 Packet-Optical Platforms in a Submarine Line Terminal Equipment (SLTE) configuration and Manage, Control and Plan (MCP) domain controller. Ciena Services is providing consulting, systems integration, maintenance and network transformation services to the cable, a collaboration between the region’s telecommunication carriers—NTT Ltd Japan Corporation (NTT LJ), PLDT, StarHub and Telekom Malaysia.

Advertisement. Scroll to continue reading.

“We have been working extensively with ASE to maximize its network assets across the last few upgrades. With WaveLogic 5 Extreme enabling 400GbE single-wave transport across any distance, ASE can scale its cable with less power and cost. Together with ASE, we are making continued progress toward a more ecofriendly, connected future without compromise,” said Jamie Jefferies, Vice President and General Manager, International, Ciena.

Advertisement
Advertisement
Advertisement

Like Us On Facebook

You May Also Like

HEADLINES

With the theme "From Milestones to Horizons: Strengthening the Future of the Legal Profession", the biennial event drew an audience of around 4,000 lawyers...

HEADLINES

The certification validates that the said infrastructure was able to meet stringent design standards for redundancy, maintainability, and uptime reliability.

HEADLINES

The representatives discussed enhancing financial access for all Filipinos through the promotion of financial inclusion and education. Additionally, they explored strategies to enhance consumer protection by...

HEADLINES

Supporting the Bangko Sentral ng Pilipinas’ (BSP) move to shift away from One-Time Passwords (OTPs) to mitigate fraud, Silent Authentication offers a more secure and...

HEADLINES

The agreement outlines the SIA Group’s intention to procure neat SAF for five years when Aether plants begin commercial production, with an option for...

HEADLINES

While PCTO is one with the government in efforts to provide equitable connectivity, it warns that the proposal, in its current form, would prove...

HEADLINES

Globe’s commitment in AI reflects these findings, according to Anton Bonifacio, Globe’s Chief AI Officer: "The integration of generative AI is central to our...

HEADLINES

The framework, developed in partnership with six innovators across the QRNG field, addresses the need for multi-vendor interoperability across the industry and enables organizations...

Advertisement